Twinning of the Arbos- Tivissa gas pipeline. Spain

España / Arbos - Tivissa
  • 89.635 m de tubería de acero
  • 7 posiciones de válvulas intermedias
  • 1 trampa de rascadores

The works consisted of the twinning of a gas pipeline between the Tivissa compression station and the Arbós compression station in the municipality of Banyeres (Tarragona). It ran parallel to the existing 20″ gas pipeline for a large part of the route. It function was to strengthen the supply of the gas network through the Port of Barcelona (Spain).

Basic units

  • 89,635 of carbon steel pipe 26″ in diameter, with pipe thicknesses of 7.1 mm to 19.5 mm.
  • 7 intermediate valve stations.
  • 1 pig receiver for inspection.