We are backed by half a century of experience as a leading company in the Spanish energy sector, where we have built more than 2,600 km of medium and high-pressure transmission lines. Some of our completed projects in Spain are:
Completed projects
- Looping of the Arbos-Tivissa gas pipeline
- Moratalla-Mula Tivissa secondary transmission pipeline
- Cartagena-Puertollano distillates pipeline Sections III and IV. Albacete-Ciudad Real
- Gas pipeline branch to Besos. Barcelona
- Cas Tresorer-Manacor-Felanit’x gas pipeline. Balearic Islands
Ongoing projects
- Downstream piping for the client EXOLUM
- Looping of the Valencia-Alicante gas pipeline Section between positions 15.14 (Paterna) and 15.20 (Montesa) for the client ENAGAS
![manchuela](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26153859/manchuela.jpg)
![suria-cardona](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26153856/suria-cardona.jpg)
![ute-besos](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26153853/ute-besos.jpg)
![ute-tarragona](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26153849/ute-tarragona.jpg)
![08-linea-03-casfel](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26154102/08-linea-03-casfel.png)
![tivissa](https://s3-bucket-wordpress-pro.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/6/2022/01/26154058/tivissa.jpg)